LLLC Case Studies & White Papers

Published 12/10/21
Updated 5/01/24
Image for LLLC Case Studies & White Papers

Novanta

NEEA Novanta FINAL 00 01 59 09 Still002 2

After learning about their unparalleled flexibility, control, and energy savings, laser manufacturing facility Novanta updated their facility to Luminaire Level Lighting Controls (LLLC). In addition to being recognized as a leader for energy efficiency, Novanta anticipates the project will result in a significant 224,996 in annual kWh savings.

Vision Profile Extrusions

Vision Profile Extrusions bright manufacturing floor still

PNW Energy Group determined Luminaire Level Lighting Controls (LLLC) would be the perfect solution for a Vision Profile Extrusions darkened manufacturing plant. With brighter lights, automated controls, a generous incentive that covered 86% of the capital cost, and deep energy savings, LLLC exceeded everyone’s expectations.

Enumclaw High School

T Enumclaw 20 resized Banner

A Washington high school with a variety of lighting needs, from offices to classrooms and science labs, sought a system that was customizable and fit right in with their new modernized campus. Their solution? LEDs equipped with Luminaire Level Lighting Controls (LLLCs).

The Future of Healthy Buildings

NEEA LLLC Healthcare 2021 04 12 152503 Banner

As we build back from the pandemic, the building industry is rethinking how we approach health in commercial spaces. Learn how LLLCs could revolutionize how we monitor and respond to environmental factors that impact human health, and discover the efficiency and health benefits of LLLCs.

South Lander Business Park

Seattle’s South Lander Business Park boasts a variety of tenants from small retail spaces to large warehouses – all with differing lighting needs that may change over time. They needed to upgrade their outdated fluorescent lighting to something more adaptable, flexible and cost-effective. The answer? LED fixtures with Luminaire Level Lighting Controls (LLLCs).

Pacific Tower

Pacific Tower Crop

Seattle’s Pacific Tower was an iconic building with a big facility maintenance challenge: its older systems were inefficient and falling short in meeting occupants’ expectations. The team wanted to implement bold system upgrades and energy conservation measures to bring the building into the modern era and provide a better lighting experience for occupants.

Puget Sound Energy

NEEA LLLC 05

In early 2015, after a number of concerns about the lighting in its Bothell location were raised, PSE evaluated their existing lighting system—ultimately recognizing the opportunity to improve occupant comfort by piloting Luminaire Level Lighting Controls.